We need to complete the renovations by the end of January and pull out all the stops in order to obtain materials and skills to complete the building to the criteria that was agreed with the Council. With this is mind, we would be very grateful if you could help us with the final ‘push’, by looking at the list below and seeing if there is anything you could help with in terms of materials, skills or funding donations:
Kitchenette: Kitchen units, shelving, preparation surface, white tiling, Non-slip lino flooring, plumbing sundries including taps, flame retardant plasterboard (5 or 6). Lighting, tiles
Upstairs Toilet: Non-slip lino flooring, appropriate plasterboard (5 approx) wood, white tiles, fixtures and fittings, lighting.
Wheel chair Accessible Disabled Toilet (downstairs): Non-slip lino flooring, appropriate plasterboard (10 approx), wood, white tiles, lighting.
Heating for the Building: 6 storage heaters, 8 Infra-red heaters
Electrical Work for whole building: A qualified Electrician. Re-wiring and replacement of all sockets and switches. Up-lighters, spotlights.
General for Whole Building: Non-hydraulic lime 3.5 x 2 bags, 4 bags of cement, 12 bags of sand. white lime wash paint / distemper (for all ceilings), fine lime putty, haired lime plaster, floor joist. General tools, nuts and bolts, screws, nails, timber, red quary tile polish, stud wall insulation, breathable loft insulation, rubber gloves, Etc.
Windows: Someone who can repair wrought iron windows. 5 litres Black smooth metal paint.
If you can help in any way with materials, skills or funding donations or would like to join the team of renovation volunteers then please contact us at: renovations@weymoutholdtownhall.co.uk
or telephone Debby on : 07919050866

